- painting part of the interiors
- restoration and refurbishment of wooden façade Windows
- refurbishment of door frames and door leaves - workshop work
- restoration of façade window sashes - workshop work
- laying new ceramic floor tiles in the toilets
- laying new ceramic tiles in the toilets
- laying floor tiles of natural stone in the rooms
- electrical installation work, installation of sockets, switches, internal and external lighting, under-gate lighting, assembly of electrical distribution boxes
- installation of an electronic security system
- installation of the camera system
- manufacturing and installation of metal railings and handrails for external stairs, internal stairs and gratings
- installation of fire extinguishers
- carpentry work and assembly of refurbished door frames and door leaves
- execution of self-levelling floor screeding
- construction of a new ceramic floor of the boiler room with levelling of the base
- manufacturing of metal lanterns (historical lamps) for lighting entrances to the under-gate
- installation of new doors and windows according to the design documentation
- restoration of the entrance wooden gate by painting
- execution of hydrophobic coating of the plinth of the walls of rooms and corridors
- grouting of natural stone floors
- coatings of metal building elements
- restoration and refurbishment of carpentry elements on the construction site
- 13th inspection day
|