- installation of interior lights
- installation of exterior lights
- renovation of wooden doors
- installation of carpentry elements
- installation of sanitary and social facilities (washbasins, water heaters, faucets, siphons, toilets, sinks, toilet walls, etc.)
- electrical installation work
- window cleaning after renovation and installation
- laying the wooden floor with mouldings
- minor construction and painting work in the interior
- installation of blacksmith locks and door handles
- LAN network assembly
- plaster repair and painting of the first floor corridor (risalite)
- hydrophobic floor coatings in the basement
- hydrophobic coating of interior wall plinths
- installation of doors with coverings of sanitary facilities
- installation of blacksmith's lanterns (lamps) of the façade
- installation of fire extinguishers
- revisions of electronic alarm systems, CCTV, electrical installation, and boiler room
- 14th inspection day
|