2022 MAY - HraMoKaPlus

Restoration of Baroque halls at the Blue Stone Castle for puppet theater, regional history
and creative workshops for children and youth



SK | EN
Go to content
2022 MAY
  • Desalination of masonry
  • Heating works
  • Restoration,refurbishment of windows and doors
  • New façade plaster
  • Demolition works
  • Construction of of new of electrical installations – high and low voltage
  • Façade penetration sprays
  • Installation of underfloor heating
  • Insulation works
  • Concreting of staircases
  • Staircase shuttering - construction + removal
  • Entrance gate repair in part
  • Preparation of a new electrical connection
  • Masonry work on the walling
  • Concreting the screed in the rooms
  • Preparation of heating pipes and waste pipes for the boiler room
  • Demolition works of the boiler room
  • Earthworks
  • Boiler  floor concreting
  • Installation of new ceramic paving in the boiler room after the works
  • Removal of arch stabilisation after elimination of static faults
  • Concreting the courtyard floor after excavation works - in part
  • Wetting of the new rough façade plaster
  • Scraping desalination plaster
  • Interior wall and ceiling cleaning by water blasting
  • Penetration of interior walls and ceilings
  • Making lime pre-spraying of façade walls
  • Making lime pre-spraying of interior walls and ceilings
  • Antisulfate sprays
  • Penetration of the original historical interior plaster
  • Repairing the grooves of the interior walls and ceilings
  • Wetting of wall and ceiling bases
  • 6nd inspection day
  • Restoration supervision
  • Archaeological research
























Back to content