- Desalination of masonry
- Heating works
- Restoration,refurbishment of windows and doors
- New façade plaster
- Demolition works
- Construction of of new of electrical installations – high and low voltage
- Façade penetration sprays
- Installation of underfloor heating
- Insulation works
- Concreting of staircases
- Staircase shuttering - construction + removal
- Entrance gate repair in part
- Preparation of a new electrical connection
- Masonry work on the walling
- Concreting the screed in the rooms
- Preparation of heating pipes and waste pipes for the boiler room
- Demolition works of the boiler room
- Earthworks
- Boiler floor concreting
- Installation of new ceramic paving in the boiler room after the works
- Removal of arch stabilisation after elimination of static faults
- Concreting the courtyard floor after excavation works - in part
- Wetting of the new rough façade plaster
- Scraping desalination plaster
- Interior wall and ceiling cleaning by water blasting
- Penetration of interior walls and ceilings
- Making lime pre-spraying of façade walls
- Making lime pre-spraying of interior walls and ceilings
- Antisulfate sprays
- Penetration of the original historical interior plaster
- Repairing the grooves of the interior walls and ceilings
- Wetting of wall and ceiling bases
- 6nd inspection day
- Restoration supervision
- Archaeological research
|