- Grouting of old quarry stone masonry (including filling of cavities)
- Installation of ventilated floor blocks
- Filling with aggregate
- Preparing a separation foil in the floor layers
- Filling under the floors
- Formwork and concreting of stairs
- Reinforcement of the stairway structures, treatment of the original ceiling structures
- The desalination of masonry
- Coatings against moisture penetration
- Installation of heat insulation floorings
- Renovation, refurbishment replacement of doors and windows
- Restorer research and restorer supervision
- Construction of new cables of electrical installations – high and low voltage
- Fitting of distribution boxes
- Installation of water supply pipes and sewer pipes
- Backfill for underground pipelines
- Insulation and concreting of floors
- 5th inspection day
|